We have divided the phase 1 construction into 4 stages.

  • Stage 1: Footings and Foundations, Constructions of the basement and the deck (which will be the first floor of the mosque) over the basement.
  • Stage 2: Construction of the shell and the exterior finish of the entire project. this will also include the rough electrical, plumbing, and air conditioning work etc..
  • Stage 3: all interior finishes electrical plumbing and air conditioning work etc..
  • Stage 4: all site work, namely access road parking lot, main sewerage on the street and sidewalks and curbs.